Switching ERP systems? Bring the open orders with you

On Friday you export the orders. On Monday the warehouse needs to know what to ship. A file called ‘final’ has yet to pack a box. Start your ERP rehearsal with the first task your team actually needs to do.

Read the articleEdition 12 November 2026
ARXE Studio mascot in an editorial illustration.
AI illustration · fictional character

By ARXE Studio

TAKE THIS TO WORK

Decide which work must continue in the new ERP, where people can find historical records and who approves the switch after an end-to-end rehearsal.

Every open order has a next step

Pull up a partially shipped order and ask the warehouse what happens next. If the new system shows the customer, order number and total but omits the remaining quantity, the warehouse could ship the same items twice. Check line items, statuses, attachments and references with the people who use them.

Decide how people will access closed orders. If the team mainly looks them up, consider a read-only archive with search, access controls and links to documents. Ask support to find an order by a serial number or its old reference. Before retiring the old ERP, check whether the archive depends on a licence or a proprietary format.

Simulated rehearsal: a workshop in South Tyrol

The test has 12 open orders, including 2 partially shipped orders, and 3 linked PDFs. Order 1042 is for 10 units. The workshop has already shipped 6. After migration, the warehouse operator finds the PDF, sees 4 units outstanding and tries to prepare exactly those 4. The order team compares all 12 orders and their statuses with an export from the old ERP.

During the rehearsal, check who can reopen a record and which system accepts new orders during the switch. If an order arrives while writes are paused, record its identifier, arrival time and next step. Before reopening, check that every queued order was recorded exactly once.

When to go ahead and when to stop

Agree on who decides, how long the window lasts and which checks must pass. Rehearse going back, too. Before the new ERP accepts any changes, reopening the old one may be enough. Once the new ERP has accepted orders or passed data to other systems, reconcile those changes and their effects before switching back.

The rehearsal shows how your own workflow behaves. The actual window depends on data volume, data quality and integrations. If the existing ERP only needs one additional workflow, consider an integration and compare both options on the same task.

Four checks for the simulated switch
CheckExpected resultWho checks
Open orders12, including 2 partially shippedOrder team
Order 10424 units left to ship and PDF availableWarehouse
Closed ordersOne record found using the old referenceCustomer support
Order received during the switchRecorded exactly onceMigration lead

Make the call.

All 12 orders appear, but the new ERP suggests shipping all 10 units on order 1042. Do you release it to the warehouse?

Choose an answer to see the reasoning.

Local, deterministic example. No data sent and no AI model called.

Sources and further reading

How this content is made

Text prepared with AI assistance. Original examples and mini-checks are simulated and show no clients or measured results. The fictional characters are not the authors.

ARXE STUDIO / TAKE THIS TO WORK

What does your team need to do on day one?

Tell us about your current ERP, an order in progress and the systems it connects to. An anonymised screenshot is enough to start planning a rehearsal.

Discuss your workflow

If some of your data comes from spreadsheets, read our guide to checking an import.